Final | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
James Ady
|
|
|
Roger is the contact. Please call Roger one hour before you arrive on site so he can meet you there and make sure the place is unlocked. Phone #: ###-#### Inspection requested via web by Deb Ipsen Final ok
|
Electrical Rough-In | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
James Ady
|
|
|
Roger is the contact. Please call Roger one hour before you arrive on site so he can meet you there and make sure the place is unlocked. Phone #: ###-#### Inspection requested via web by Deb Ipsen Surface mounted conduit . rough in ok
|
Electrical Rough-In | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Daryl DeGrange
|
|
|
underground inspection. Shane is the contact Phone #: ###-#### Inspection requested via web by Deb Ipsen Rough-in ok cover underground to detacted shop.
|