Final | 11/26/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
James Ady
|
|
|
john Phone #: ###-#### final ok
|
Final | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | PART |
James Ady
|
|
|
John Phone #: ###-#### 210.63 RTU Service receps shall be on the line side of service disc., All exterior walls ok for final High speed doors and Big fans located on perimeter need wired before final. TCO ok
|
Permanent Service | 10/28/2019 | 10/29/2019 | 10/29/2019 | A | PASS |
James Ady
|
|
|
John Phone #: ###-#### p/s u/g n ok
|
Final | 10/29/2019 | 10/29/2019 | 10/29/2019 | P | PART |
James Ady
|
|
|
John Phone #: ###-#### Partial final ok Breakroom, Restrooms, offices and Conf. room. Final ok
|
Electrical Rough-In | 10/23/2019 | 10/24/2019 | 10/24/2019 | P | PASS |
James Ady
|
|
|
John Phone #: ###-#### All drop ceiling only ok to cover
|
Electrical Rough-In | 9/30/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Rock A. Hudson
|
|
|
John Phone #: ###-#### Bathrooms walls and hardlids rough in ok cover.
|
Electrical Rough-In | 9/26/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
James Ady
|
|
|
John Phone #: ###-#### Demizing wall and all front office areas walls only ok to cover
|
Electrical Rough-In | 9/5/2019 | 9/9/2019 | 9/9/2019 | P | PASS |
James Ady
|
|
|
John Phone #: ###-#### Floor boxes in training room and Conference room ok to cover
|