Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberELE19-03127
StatusIssued
Name SNAKE RIVER ELECTRIC INC
Site Address 2140 E SUMMERSWEET DR
Project Name 
Customer Number0000
ePlanReviewNo
Description
New: Permit is for Building #1A that totals 5,197 SF with (4) four storage units and the construction of the 658 sq. ft. clubhouse with two single user restrooms.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Electrical Rough-In1/29/20201/29/20201/29/2020PPASS
DetailsJames Ady
Ceiling inspection for Building #1 Clubhouse. Thank you! Phone #: ###-#### Inspection requested via web by Stuart Welton Cord removed above drop ceiling ok to cover
Final1/28/20201/28/20201/28/2020PPART
DetailsJames Ady
Final Building #1 Phone #: ###-#### Inspection requested via web by Stuart Welton Strap riser to house panel, Remove temperary heat tape TCO ok
Electrical Rough-In1/28/20201/28/20201/28/2020PPART
DetailsJames Ady
Ceiling inspection Building #1 Clubhouse Phone #: ###-#### Inspection requested via web by Stuart Welton 400.12 Flexable cords shall not be ran above drop ceilings. Ok to cover will have ladder onsite at final to check .
Electrical Rough-In12/18/201912/18/201912/18/2019PPASS
DetailsJames Ady
Clubhouse rough in inspection... Phone #: ###-#### Inspection requested via web by Stuart Welton walls only ok to cover
Permanent Service12/18/201912/18/201912/18/2019PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Stuart Welton p/s u/g n ok
Electrical Rough-In11/25/201911/25/201911/25/2019APASS
DetailsJames Ady
Rough in inspection for (4) units only. thank you Phone #: ###-#### Inspection requested via web by Stuart Welton Access will need provided for UFER connection. (2 gang opening minimum.) 4 units only. ok to cover
Permanent Service11/13/201911/13/201911/13/2019PCANC
DetailsJames Ady
Service inspection Building #1...thank you Phone #: ###-#### Inspection requested via web by Stuart Welton
Electrical Rough-In9/24/20199/24/20199/24/2019PPASS
DetailsJames Ady
Underground rough-in for building lighting located near Building #1A Phone #: ###-#### Inspection requested via web by Stuart Welton Underground only ok to cover
Electrical Rough-In9/23/20199/23/20199/23/2019PPASS
DetailsJames Ady
Underground rough-in for light pole, air station and gate power located near Building #1A Phone #: ###-#### Inspection requested via web by Stuart Welton Areas listed ok to cover
Electrical Rough-In8/20/20198/21/20198/21/2019APASS
DetailsDaryl DeGrange
Underground inspection Phone #: ###-#### Inspection requested via web by Stuart Welton Buuilding #1A Rough-in ok cover underground service feeders