Final | 11/20/2019 | 11/21/2019 | 11/21/2019 | P | PASS |
Eric Story
|
|
|
Final on service upgrade and driveway heat. System is tested and operational. any questions, please call Steve ###-#### Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer Final ok
|
Permanent Service | 10/3/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
James Ady
|
|
|
Kim RME ###-####. Rescheduled from10/2 upon Kim's request. Service is existing. Bumped to 600A from 400A. CT meter not onsite at time of service inspection p/s u/g rec ok
|
Permanent Service | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | NR |
James Ady
|
|
|
Kim RME ###-####. Rescheduled from10/2 upon Kim's request. Not ready still landing feeders and grounding electrode conductor
|
Permanent Service | 10/1/2019 | 10/2/2019 | 10/2/2019 | P | CANC |
Mark Moncarr
|
|
|
Permanent Service with CT. Kim ###-####. Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer Rescheduled for 10/3 upon Kim's request from RME.
|
Electrical Rough-In | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PASS |
Rock A. Hudson
|
|
|
Reinspect cold leads and bushings, provided manufacturers instructions Phone #: ###-#### Inspection requested via web by Steve Blackmer Corrections made rough in ok cover
|
Electrical Rough-In | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Driveway heat before cover. Please call Steve with any questions. Thank you Phone #: ###-#### Inspection requested via web by Steve Blackmer 426.22(B)- All but 1" to 6" of non-heating lead shall be enclosed in raceway. 426.22(C)- Bushings shall be provided where cold leads enter conduit. * Provide manufacturers instructions.
|