Final | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Tom Saunders
|
|
|
On previous inspection, inspector requested electrician to be present at time of final inspection. PLEASE CONTACT MATT (electrician) 1 HR PRIOR TO ARRIVAL SO HE CAN BE PRESENT. He will be servicing other jobs until he receives notification of arrival time. ###-#### Phone #: ###-#### Inspection requested via web by Same Electric.. job complete...hot tub installed...grounding fixed...ok to final
|
Permanent Service | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Same Electric...
power restored before inspection done... p/s u/g reconnect ok
|
Final | 9/3/2019 | 9/4/2019 | 9/4/2019 | P | FAIL |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Same Electric... 1) proper size and connection to uffer required for upsized service 2) hot tub shall be installed and running to final permit 3) electrician required present at time of final to open service being that power has been restored without inspection
|
Final | 9/3/2019 | 9/4/2019 | 9/3/2019 | A | CANC |
Tom Saunders
|
|
|
Phone #: ###-#### >> Inspection requested via web by Same Electric Inspection cancelled from web by: Same Electric
|