Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberELE19-03219
StatusFinaled
Name SAME DAY ELECTRIC
Site Address 2697 S GEORGETOWN AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration or Repair: Upgrade meter to 200 amp meter panel combo. Then run 50 amp hot tub circuit out of new panel to other side of house down to disconnect.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/19/20199/19/20199/19/2019PPASS
DetailsTom Saunders
On previous inspection, inspector requested electrician to be present at time of final inspection. PLEASE CONTACT MATT (electrician) 1 HR PRIOR TO ARRIVAL SO HE CAN BE PRESENT. He will be servicing other jobs until he receives notification of arrival time. ###-#### Phone #: ###-#### Inspection requested via web by Same Electric..
job complete...hot tub installed...grounding fixed...ok to final
Permanent Service9/4/20199/4/20199/4/2019PPASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Same Electric...

power restored before inspection done...
p/s u/g reconnect ok
Final9/3/20199/4/20199/4/2019PFAIL
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Same Electric...
1) proper size and connection to uffer required for upsized service
2) hot tub shall be installed and running to final permit
3) electrician required present at time of final to open service being that power has been restored without inspection
Final9/3/20199/4/20199/3/2019ACANC
DetailsTom Saunders
Phone #: ###-#### >> Inspection requested via web by Same Electric Inspection cancelled from web by: Same Electric