Final | 10/16/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
James Ady
|
|
|
Hot Tub/Branch circuit wiring complete. Ready for final inspections. Will not be available from 3:00pm to 3:30pm. Please call 15min before arrival thanks Phone #: ###-#### Inspection requested via web by Jarvis Klatt hot tub final ok
|
Rough-In Permanent Service | 9/17/2019 | 9/18/2019 | 9/18/2019 | P | CANC |
James Ady
|
|
|
Branch circuit inspection from the Breaker Box to the Spa Sub-panel to where the hot tub will be located, hot tub has not yet arrived, would like inspection so sheet rock can be installed above breaker box and verify i''m on track. Please call approx 15-20 min before getting to the house. thanks Phone #: ###-#### Inspection requested via web by Jarvis Klatt
|
Electrical Rough-In | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
James Ady
|
|
|
Branch circuit inspection from the Breaker Box to the Spa Sub-panel to where the hot tub will be located, hot tub has not yet arrived, would like inspection so sheet rock can be installed above breaker box and verify i''m on track. Please call approx 15-20 min before getting to the house. thanks Phone #: ###-#### Inspection requested via web by Jarvis Klatt 6-3 to panel ok to cover
|
Conference | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jarvis Klatt Talked about 6-3 from panel, transition from romex to THWN when leaving attic, sch80 PVC above ground, Bonding metal gutter to tub with 8awg solid, GFCI protection.
|