Final | 2/6/2020 | 2/7/2020 | 2/7/2020 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Bonnie Page Ok final.
|
Electrical Rough-In | 12/9/2019 | 12/10/2019 | 12/10/2019 | A | PASS |
Mark Moncarr
|
|
|
inspection for floor heat in both the master bathroom and basement bathroom Phone #: ###-#### Inspection requested via web by Bonnie Page Ok cover flr heat mstr and basement.
|
Rough-In Permanent Service | 9/5/2019 | 9/5/2019 | 9/5/2019 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by mike brown Ok cover. Floor outlets to be added if needed at back sliders. p/s u/g n ok
|
Conference | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | DONE |
Mark Moncarr
|
|
|
Please contact Mike Brown at ###-#### Phone #: ###-#### Inspection requested via web by Bonnie Page Discussed pop ups in kitchen to left and right of sink. DW is on 1 side, and another appliance on right. Outlets will be about 2-3 inches outside 24. Framing wont allow for proper placement. Im allowing it.
|