Final | 9/24/2019 | 9/26/2019 | 9/26/2019 | A | PASS |
James Ady
|
|
|
Contact Barry Spencer with any questions. ###-#### Phone #: ###-#### Inspection requested via web by Rob Maes final ok
|
Electrical Rough-In | 9/24/2019 | 9/24/2019 | 9/24/2019 | P | PASS |
James Ady
|
|
|
Contact Barry Spencer with any questions. ###-#### Phone #: ###-#### Inspection requested via web by Rob Maes Line side connection check at rough in. All outside gear was in place and laded. Rough in ok Listing ok
|