Final | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | PASS |
Tom Saunders
|
|
|
Questions call Jay 2087054245 Phone #: ###-#### Inspection requested via web by Seth Stears...corrections made..labelling, disconnect, and OCPD ok
|
Final | 10/4/2019 | 10/7/2019 | 10/7/2019 | A | FAIL |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Seth Stears... 1) solar panel needs labelled...OCPD need clear, evident, and specific purpose or use....408.4
|
Electrical Rough-In | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Seth Stears... UL listing verified lineside connection accessible from outside...no one needs to be present for final
|