Final | 9/23/2019 | 9/24/2019 | 9/24/2019 | A | PASS |
Eric Story
|
|
|
Install complete per approved plans; the stamped and approved plans are on site; For any questions about the work done for this project, call Jed at ###-####; For any questions about the plans or design, call Ryan at ###-####; thanks guys
The homeowner will be there to give access to the garage and you can give them a call on your way over at 970.371.4627 Phone #: ###-#### Inspection requested via web by Ryan King Solar Array final ok
|
Electrical Rough-In | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Eric Story
|
|
|
listing inspection for solar equipment Phone #: ###-#### Inspection requested via web by Ryan King Verifeid listing and scope of work on Solar Array install
|