Final | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PASS |
James Ady
|
|
|
B31 upgrade final inspection. Phone #: ###-#### Inspection requested via web by Steve Moss Final ok
|
Electrical Rough-In | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PASS |
James Ady
|
|
|
B31 upgrade final inspection. Phone #: ###-#### Inspection requested via web by Steve Moss All conduits surface mounted. VFD's have been programmed
|
Electrical Rough-In | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
James Ady
|
|
|
Look at underground conduits before backfill. Phone #: ###-#### Inspection requested via web by Steve Moss Underground only ok to cover
|