Permanent Service | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Tom Saunders
|
|
|
reconnect...ok...future final inspection required for generator install
|
Final | 2/5/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Tom Saunders
|
|
|
New meter base installed with backup generator. Needs to be inspected prior to energizing. Please call Pat with any questions ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean... p/s u/g reconnect ok
|
Conference | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | DONE |
Daryl DeGrange
|
|
|
We are currently connected to a 200 amp meter main, and need to disconnect power and replace with 200 amp meter base. Homeowner is adding backup generator. Our foreman, Pat Bulson ###-#### spoke with Eric Clampitt and was instructed to request a conference. Phone #: ###-#### Inspection requested via web by Joe McLean contractor indicated generator location, discussed clearances, manufactures instructions,separately derived systems. I believe this meeting was mean for a Idaho Power representative
|
Permanent Service | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Tom Saunders
|
|
|
Thank you. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE... fees need adjustedbefore final p/s u/g meter new location ok
|