Final | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
James Ady
|
|
|
Home owner will be home to see outlets in garage as GFCI Phone #: ###-#### Inspection requested via web by Joseph Yergensen final ok
|
Electrical Rough-In | 9/29/2019 | 9/30/2019 | 9/30/2019 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Yergensen Contractor pulled meter himself and did service upgrade. 2 receps added under panel shall be GFCI protected as per 210.8A2. All electrical equipment installed at time of rough in. Will need access to the garage at final to check GFCI protection of added receps. Listing ok.
|