Final | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Mark Moncarr
|
|
|
Thank you ; have a nice day! Phone #: ###-#### Inspection requested via web by JENNY EMEL Ok final. Corrections made. Verified with contractor that NO work was done on rooftop. Rooftop is existing.
|
Final | 10/28/2019 | 10/28/2019 | 10/28/2019 | P | FAIL |
Tom Saunders
|
|
|
Please contact Bruce with any questions. Have a lovely afternoon! Phone #: ###-#### Inspection requested via web by JENNY EMEL... 1) all recepticles 120/240 volt single or 3 phase shall have GFCI protection in kitchen area including behind counter for employees 2) all hard wired appliances shall have means to lockout in the off position at the OCPD 3) access required to verify units on roof top 4) proper access to junction boxes/outlets required...outlet in cabinet
|
Rough-In Permanent Service | 9/20/2019 | 9/20/2019 | 9/20/2019 | A | CANC |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by JENNY EMEL...wrong inspection scheduled...rough in done
|
Electrical Rough-In | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | PASS |
Tom Saunders
|
|
|
This is the correct inspection for this morning. My apologies
Have a nice day! Phone #: ###-#### Inspection requested via web by JENNY EMEL... ok to cover dropped ceiling and bakery service back wall...discussed mini cans being cut in after sheetrock installed in drop ceiling...junctions for mini cans are non IC rated...no insulation can be on top of drop ceiling
|