Final | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | PASS |
Mark Moncarr
|
|
|
###-#### Inspection was supposed to be scheduled for 2/12 as per contractor. Ok final. 200a serviced with 2 pole 30 installed. All labels present
|
Final | 2/11/2020 | 2/11/2020 | 2/11/2020 | A | CANC |
Mark Moncarr
|
|
|
Please call ahead with a time frame. Phone #: ###-#### Inspection requested via web by BRS Permitting Rescheduled for 2/12 as per contractor
|