Final | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | PASS |
Mark Moncarr
|
|
|
Door code 9875 Phone #: ###-#### Inspection requested via web by Greg Idsinga Ok final. No walls were open, and just small portions of ceilings to fish wire. All light trims are cutin LED.
|
Final | 2/13/2020 | 2/14/2020 | 2/13/2020 | A | CANC |
Mark Moncarr
|
|
|
Door code 9875 Phone #: ###-#### >> Inspection requested via web by Greg Idsinga Inspection cancelled from web by: Greg Idsinga
|
Electrical Rough-In | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | PASS |
Mark Moncarr
|
|
|
heated floor Phone #: ###-#### Inspection requested via web by Greg Idsinga Ok cover flr heat mstr.
|
Electrical Rough-In | 9/26/2019 | 9/26/2019 | 9/26/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Greg Idsinga Ok cover main floor living, kitchen and mstr bed. Basement small room to left of stairs. 2 outlets to left and right of kitchen sink need to be within 24". Will need to see on final.
|