Final | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | PASS |
Mark Moncarr
|
|
|
Mark Phone #: ###-#### Ok final. Smokes on with bed circuit, GFI installed down low by toilet within 6' of bath sink.
|
Electrical Rough-In | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | PASS |
Mark Moncarr
|
|
|
Mark Phone #: ###-#### Ok cover floor heat in ADU bath.
|
Electrical Rough-In | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Mark Moncarr
|
|
|
Mark Phone #: ###-#### Ok cover detached structure on E side of property
|
Permanent Service | 10/29/2019 | 10/30/2019 | 10/30/2019 | P | PASS |
Mark Moncarr
|
|
|
Marcus Phone #: ###-#### p/s o/h n ok
|
Conference | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | DONE |
Mark Moncarr
|
|
|
Mark Phone #: ###-#### Discussed circuits needed for kitchen, and outlet layout for other rooms.
|