Final | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | PASS |
Mark Moncarr
|
|
|
Back door to east building is open. Call with any questions-Thanks Phone #: ###-#### Inspection requested via web by mark hood Ok final.
|
Electrical Rough-In | 1/17/2020 | 1/17/2020 | 1/17/2020 | P | PASS |
Mark Moncarr
|
|
|
Would like bathroom rough walls fo cover. Can you also look at front office area They would like to install tiles Phone #: ###-#### Inspection requested via web by mark hood Ok cover bathrooms.
|
Electrical Rough-In | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Mark Moncarr
|
|
|
Need inspection for rough walls in office area at north end of bldg. They want to drywall. Call with any questions. ###-#### Phone #: ###-#### Inspection requested via web by mark hood Ok cover office walls N side of building.
|
Electrical Rough-In | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | PASS |
Mark Moncarr
|
|
|
need rough walls for drywall cover in warehouse only. Lighting in warehouse. for roof insulation installation Thank call with any questions Phone #: ###-#### Inspection requested via web by mark hood Ok cover warehouse only. All lighting has surface mount conduit with no insulation in ceiling.
|