Final | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PASS |
Eric Story
|
|
|
Kenny Williams is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Correction fixed-Final ok
|
Final | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | FAIL |
Tom Saunders
|
|
|
Kenny Williams is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce...
1) panel shall be legiblyidentified to it's clear, evident, and specific purpose or use..408.4
2) sch80 PVC shall be used where exposed to physical damage..at panel above ground...352.10(F)
|
Electrical Rough-In | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | PASS |
Eric Story
|
|
|
Underground Inspection, Dwayne Lewis is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce U/G for parking lot lights on east side ok to cover
|
Electrical Rough-In | 10/7/2019 | 10/8/2019 | 10/7/2019 | A | CANC |
Eric Story
|
|
|
Dwayne Lewis is contact at ###-####. UNDERGROUND Inspection. Phone #: ###-#### >> Inspection requested via web by Debby Pierce Inspection cancelled from web by: Debby Pierce
|
Electrical Rough-In | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Eric Story
|
|
|
Underground ; 3 pole Foundations, Dwayne Lewis is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce U/G and 3 pole bases ok to cover and pour
|