Final | 10/7/2019 | 10/9/2019 | 10/9/2019 | P | PASS |
Mark Moncarr
|
|
|
Install complete per approved plans; the stamped and approved plans are on site; For any questions about the work done for this project, call Jed at ###-####; For any questions about the plans or design, call Ryan at ###-####; thanks guys
The homeowner will be there to give access to the garage and you can give them a call on your way over at ###-#### Phone #: ###-#### Inspection requested via web by Ryan Ok final. Placard on meter stating where disc means is located.
|
Electrical Rough-In | 9/26/2019 | 9/26/2019 | 9/26/2019 | A | PASS |
Mark Moncarr
|
|
|
listing inspection for solar equipment; first day of panels; everything on the ground; crew starts at 8; thank you guys Phone #: ###-#### Inspection requested via web by Ryan King Ok cover. Pabels onsite match listing of paperwork provided.
|