Final | 10/14/2019 | 10/17/2019 | 10/17/2019 | A | PASS |
Rock A. Hudson
|
|
|
220V Spa Circuit ; Connection , 50A Spa Sub Panel Phone #: ###-#### Inspection requested via web by Louis Keller Final ok
|
Electrical Rough-In | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Rock A. Hudson
|
|
|
220V Spa Circuit ; Connection , 50A Spa Sub Panel Phone #: ###-#### Inspection requested via web by Louis Keller All surface mount to pad with slate pavers. Rough in ok
|