Final | 8/6/2020 | 8/11/2020 | 8/11/2020 | A | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Jonathan Poot Duplicate inspection
|
Final | 8/6/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Jonathan Poot Ok final.
|
Final | 7/13/2020 | 7/14/2020 | 7/14/2020 | A | CANC |
Mark Moncarr
|
|
|
Homeowner is working from home, so she will be there. Phone #: ###-#### Inspection requested via web by Jonathan Poot Unable go complete inspection. Homeowner said pool comp hasnt completed pool servicing. I believe lights are controlled by WIFI via phone app. Contractor was going to find out and schedule another inspection.
|
Electrical Rough-In | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | PASS |
Mark Moncarr
|
|
|
Please check pool apron grounding, as well as pool equipment wiriing. Concrete is scheduled for 1pm on Thursday. Thanks. Phone #: ###-#### Inspection requested via web by Jonathan Poot Ok cover.
|
Electrical Rough-In | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Mark Moncarr
|
|
|
Please inspect underground work and bonding. Thank you. Phone #: ###-#### Inspection requested via web by Jonathan Poot Ok cover grd work and pool bonding. Pipe clamps rated for rebar sizes 4-8, direct burial and approved for concrete encasement. 4 corners and main bond back. 2 light W side.
|
Electrical Rough-In | 11/1/2019 | 11/4/2019 | 11/4/2019 | A | NR |
Mark Moncarr
|
|
|
We need a Bonding inspection, and an Underground cover inspection. Phone #: ###-#### Inspection requested via web by Jonathan Poot Conduit is done but no bonding. Do not cover.
|