Final | 10/23/2019 | 10/29/2019 | 10/29/2019 | A | PASS |
Mark Moncarr
|
|
|
Plans left on site Phone #: ###-#### Inspection requested via web by Kilee Russell Ok final. Labels present, 200a serv, 40a installed.
|
Electrical Rough-In | 10/23/2019 | 10/28/2019 | 10/28/2019 | P | PASS |
Tom Saunders
|
|
|
Can we do a 1PM inspection in conjunction with a power to panel that we need in order to turn the power back on after doing a meter upgrade? Phone #: ###-#### Inspection requested via web by Kilee Russell... UL listings verified...will require access to backyard for final
|
Permanent Service | 10/23/2019 | 10/28/2019 | 10/28/2019 | P | PASS |
Tom Saunders
|
|
|
Can we do a 1PM inspection in conjunction rough inspection? We need this inspection because we are doing a meter upgrade and in order to turn the power back on. Phone #: ###-#### Inspection requested via web by Kilee Russell... guide wire kit required p/s o/h reconnect ok
|