Final | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | PASS |
Tom Saunders
|
|
|
Requesting Electrical Final for Health and Welfare. Thanks Tim Phone #: ###-#### Inspection requested via web by Tim Lawrence... ok to final...phase 1 future phases will require new permit
|
Electrical Rough-In | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | PASS |
Tom Saunders
|
|
|
Requesting a ceiling inpection for remainder of conference room. Thanks Tim Phone #: ###-#### Inspection requested via web by Tim Lawrence...ok LV off grid
|
Electrical Rough-In | 11/7/2019 | 11/7/2019 | 11/7/2019 | P | PART |
Tom Saunders
|
|
|
Electrical rough in for Ceiling inspection. ###-#### Phone #: ###-#### Inspection requested via web by Tim Lawrence... new office and breakroom ok new 'background check' area needs LV wiring off grid before cover given
|
Electrical Rough-In | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | PASS |
Tom Saunders
|
|
|
Electrical Rough in on new wall. Added 7 Electrical Outlets and 5 Data stubs.
Tim ###-#### Phone #: ###-#### Inspection requested via web by Tim Lawrence...wall ok to cover
|
Electrical Rough-In | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Mark Moncarr
|
|
|
Health and welfare rough in Tim ###-#### Phone #: ###-#### Inspection requested via web by Tim Lawrence Ok cover. Corrections made.
|
Electrical Rough-In | 10/2/2019 | 10/4/2019 | 10/4/2019 | A | FAIL |
James Ady
|
|
|
Requesting Electrical Rough in Inspection. Thanks Tim ###-#### Phone #: ###-#### Inspection requested via web by Tim Lawrence 330.12 MC cable shall not be exposed to physical damage. (MC shall not be strapped inside metal stud chanels) 330.17, 300.4D MC shall not be secured within 1 1/4in from the face of framing member. ( Multiple places in each area inspected. ) 362.12(8) ENT shall not be exposed to physical damage. (Installed in channel of metal studs.)
|