Final | 11/5/2019 | 11/5/2019 | 11/5/2019 | P | PASS |
James Ady
|
|
|
Final garage perm service and 2 branches. Phone #: ###-#### Inspection requested via web by Nick Stobbe Final ok
|
Electrical Rough-In | 10/29/2019 | 10/29/2019 | 10/29/2019 | P | PASS |
Rock A. Hudson
|
|
|
Rough in for new service line, meter, panel, and 2 branch circuits. Phone #: ###-#### Inspection requested via web by Nick Stobbe Garage may not have wall cover at time of final but owner installed MC cable throughout, any cloth NM cable in place has been abandoned. Rough in ok cover.
|
Permanent Service | 10/29/2019 | 10/29/2019 | 10/29/2019 | P | PASS |
Rock A. Hudson
|
|
|
Rough in for new service line, meter, panel, and 2 branch circuits. Phone #: ###-#### Inspection requested via web by Nick Stobbe p/s o/h n ok
|
Conference | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | DONE |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Nick Stobbe Discussed service for and wiring in existing detached garage. Minimum receptacles and luminaires required. GFCI protection, WR, TR, secure and support of MC and NM cable. Minimum wire size for 200 amp back to back, grounding electrodes and distance between ground rods. Pamphlet given. Owner has good understanding of scope of work.
|