Final | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | PASS |
Mark Moncarr
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by Eric Brown Ok final.
|
Electrical Rough-In | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Mark Moncarr
|
|
|
Master bath floor heat inspection. Directions and specs are in vanity cabinet drawer. Thank you! Phone #: ###-#### Inspection requested via web by Eric Brown Ok cover flr heat mstr.
|
Rough-In Permanent Service | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Mark Moncarr
|
|
|
100% ready. Thanks Phone #: ###-#### Inspection requested via web by Eric Brown Ok cover. 4 cans front, 2 cans back with fire hats installed. p/s u/g n ok
|