Final | 1/28/2020 | 1/29/2020 | 1/29/2020 | A | PASS |
James Ady
|
|
|
Gate to backyard is unlocked Phone #: ###-#### Inspection requested via web by Paul Stewart final ok
|
Electrical Rough-In | 10/10/2019 | 10/10/2019 | 10/10/2019 | A | PASS |
James Ady
|
|
|
Conduit laid in ground and waiting to get okay to bury Phone #: ###-#### Inspection requested via web by Paul Stewart Underground from disc. to new A/C location only ok to cover
|
Conference | 10/7/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
James Ady
|
|
|
Prefer after 2pm if possible Phone #: ###-#### Inspection requested via web by Paul Stewart talked about moving a/c disc. Conduit will be ran 18in under pavers. A/C is 23.5A min and 40A max. 10awg in conduit to new disc. location. owner has done work before and is aware of inspection process
|