Final | 12/23/2019 | 12/26/2019 | 12/26/2019 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kurt Carlson Final ok
|
Electrical Rough-In | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Rock A. Hudson
|
|
|
Ceiling inspection above grid ready for cover Phone #: ###-#### Inspection requested via web by Kurt Carlson Grid rough in ok cover
|
Electrical Rough-In | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PASS |
Rock A. Hudson
|
|
|
Electrical floor box with data for future conference room and some electrical rough in in adjacent wall ready for cover. Phone #: ###-#### Inspection requested via web by Kurt Carlson Just inside space to right floor box for receptacle and data rough in ok cover
|
Electrical Rough-In | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PASS |
Rock A. Hudson
|
|
|
Tenant is located at the south west end of the building. Doors will be open, Steve is the G.C. contact for the project, he is with Zelham. He is on site to answer any questions or call me, Kurt. Ready for wall rough in, some overhead. Phone #: ###-#### Inspection requested via web by Kurt Carlson Unit located on south west corner of building. Unit has misc offices and a small conference rm. Wall rough in ok cover
|