Final | 12/2/2019 | 12/2/2019 | 12/2/2019 | P | PASS |
Eric Story
|
|
|
Electrical final. Brett is the contact. Please call him 30 minutes before showing up so he can meet you there. Thanks Phone #: ###-#### Inspection requested via web by Deb Morton No Occ card on site-Final ok
|
Final | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | FAIL |
Rock A. Hudson
|
|
|
electrical final. Brett is the contact Phone #: ###-#### Inspection requested via web by Deb Morton Furniture not complete as per 314.25, listing verified. Must be a ceiling inspection, lighting retro being done throughout. Must verify listing and seismic wires for all new luminaires as per 110.3 and 300.11
|
Electrical Rough-In | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Rock A. Hudson
|
|
|
Brett is the contact.Please call 30 minutes before you arrive so he can get you access. Phone #: ###-#### Inspection requested via web by Deb Ipsen 2 Offices and small conference rm wall rough i ok cover.
|