Final | 11/15/2019 | 11/15/2019 | 11/15/2019 | A | PASS |
Eric Story
|
|
|
Final on TI for 3rd floor. Phone #: ###-#### Inspection requested via web by Jason Gaythwaite Occ card signed-Final ok
|
Electrical Rough-In | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PASS |
Rock A. Hudson
|
|
|
Ceiling inspection on 3rd floor Phone #: ###-#### Inspection requested via web by Jason Gaythwaite Discussed with general foreman what is needed for final. All shall be ready to use. He stated no electrical furniture being installed, misc covers missing due to painting need to be installed on old as well as new. Grid in 6 offices only rough in ok cover
|
Electrical Rough-In | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Eric Story
|
|
|
Inspection on new office walls Phone #: ###-#### Inspection requested via web by Jason Gaythwaite
Walls only 3rd floor in added offices only ok to cover
|