Final | 12/22/2019 | 12/23/2019 | 12/23/2019 | A | PASS |
Eric Story
|
|
|
please call Blaine burgen ###-####. He is the general and will meet you there and get you upstairs. Thanks Brian Phone #: ###-#### Inspection requested via web by brian morrow Occ Card signed-Final ok
|
Electrical Rough-In | 10/24/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Rock A. Hudson
|
|
|
when you arrive please call andrea @ ###-#### and she will meet you at front desk and take you upstairs. Thank You Phone #: ###-#### Inspection requested via web by brian morrow Called contact Andrea and Brian the electrical contractor to inform of note on building permit about all electrical conduits and raceways shall be supported off grid and shall have independant support. Level 4 office remodel wall rough in ok cover
|