Final | 6/14/2020 | 6/15/2020 | 6/15/2020 | A | PASS |
Rock A. Hudson
|
|
|
Call with any questions thanks! Phone #: ###-#### Inspection requested via web by Trevor Soesbe Final ok
|
Electrical Rough-In | 4/22/2020 | 4/23/2020 | 4/23/2020 | A | PASS |
Rock A. Hudson
|
|
|
I made the Corrections and the plans were on there way when I left call with any questions thanks! Phone #: ###-#### Inspection requested via web by Trevor Soesbe Space located around north side of building thru gate. City approved set of prints on site. Rough in ok cover
|
Electrical Rough-In | 4/22/2020 | 4/22/2020 | 4/22/2020 | P | FAIL |
Rock A. Hudson
|
|
|
Roughed this in back in I believe November then they had issues with the plans but I think everything is good to go now. Call with any questions thanks! Phone #: ###-#### Inspection requested via web by Trevor Soesbe 110.12(B)- Equipment shall not be damaged. Replace or repair MC where outer cover seperated in 1/2 wall office. 300.4- Where MC is run thru bored holes that do not maintain 1 1/4" from framing surface cable shall be protected from damage. N.E. office. 348.30- Flex and EMT shall be supported and secured so not hanging below ceiling trusses. City approved set pf prints shall be on site prior to inspection.
|