Final | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok final. All labels present
|
Electrical Rough-In | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | PASS |
Mark Moncarr
|
|
|
Please call Shaun at ###-#### before arriving on site, so that we can have someone meet the inspector. Thanks! Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok cover. Components UL listed
|
Electrical Rough-In | 11/11/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Mark Moncarr
|
|
|
Roughed in Conduit for solar. Located in garage and goes to roof. Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok cover conduit to right of panel in garage to rooftop on E side of house.
|