Final | 2/12/2020 | 2/12/2020 | 2/12/2020 | A | PASS |
Mark Moncarr
|
|
|
I may or may not be on site. the forman on the project named luka will be there. feel free to call me if you want. Phone #: ###-#### Inspection requested via web by Taras Shulga Ok final. 3/0 blank in closet ceiling.
|
Electrical Rough-In | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | PASS |
Mark Moncarr
|
|
|
look at 2nd fl.bathroom floor heat wire. Phone #: ###-#### Inspection requested via web by Taras Shulga Ok cover floor heat up bath.
|
Electrical Rough-In | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Taras Shulga Ok cover whole house. Disc means will be needed on house for sub-panel inside.
|