Final | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | NR |
Mark Moncarr
|
|
|
William Phone #: ###-####
|
Electrical Rough-In | 2/12/2020 | 2/19/2020 | 2/19/2020 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by William Emmons Ok cover shed. Check neutrals in disconnect at final.
|
Conference | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | DONE |
Mark Moncarr
|
|
|
###-#### Discussed wire type and disconnecting means for 2 circuits going out to shed.
|
Electrical Rough-In | 11/13/2019 | 11/18/2019 | 11/18/2019 | A | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by William Emmons Changed to a conference.
|