Final | 1/20/2020 | 1/21/2020 | 1/21/2020 | A | NR |
Rock A. Hudson
|
|
|
approve for ceiling tile cover in kitchen addition. please cal 30 minutes prior to arrival Phone #: ###-#### Inspection requested via web by aaron dill Minor work yet to complete in north entrance.
|
Electrical Rough-In | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Rock A. Hudson
|
|
|
approve for ceiling tile cover in kitchen addition. please cal 30 minutes prior to arrival Phone #: ###-#### Inspection requested via web by aaron dill Kitchen grid rough in ok cover. Warned about work space for panel boards. Already using kitchen area.
|
Electrical Rough-In | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
Rock A. Hudson
|
|
|
please call aaron 30 minutes prior to arrival. thank you! Phone #: ###-#### Inspection requested via web by aaron dill Small kitchen wall rough in ok cover.
|
Rough-In Permanent Service | 11/16/2019 | 11/18/2019 | 11/18/2019 | A | PASS |
Rock A. Hudson
|
|
|
Preferably late morning. re-routing feeders to panel at wild root. please call ###-#### 30 minutes ahead. contractor will meet you on site. Phone #: ###-#### Inspection requested via web by aaron dill Move and refeed 200 amp sub-panel. Meter base installed on load side of disconnecting means. All work space shall be provided for all panel boards in basement and 200 amp panel being refed. Rough in on new location ok. p/s u/g rec ok
|