Final | 2/4/2020 | 2/5/2020 | 2/5/2020 | P | PASS |
Mark Moncarr
|
|
|
I will be on site by "High Noon" hope to see you then!
Thx, Steve, BPL, ###-#### Phone #: ###-#### Inspection requested via web by Steven Meredith Ok final. Countertop to right of refer had a AFI/GFI combo brkr. The GFI portion of brkr was not functioning. Contractor changed out to GFI brkr only. Plug mold functioned properly.
|
Permanent Service | 1/28/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Mark Moncarr
|
|
|
Hi Mark, this is an upgrade to 200a. that we looked at a while back, we hope to have this in shortly after noon since the unit is also occupied! Thx. Steve, BPL Phone #: ###-#### Inspection requested via web by Steven Meredith p/s o/h rec ok
|
Electrical Rough-In | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | PASS |
Mark Moncarr
|
|
|
We are looking for a cover inspection only for kitchen, pantry, office, laundry,1/2 bath, master bath,closet ; bedroom! Rick will be on site, late morning best if possible! Thx, Steve, BPL Ricks number is: 208.880.7791 Phone #: ###-#### Inspection requested via web by Steven Meredith Ok cover areas listed
|
Conference | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | DONE |
Mark Moncarr
|
|
|
Im looking to conference on our service modifications and a few kitchen questions before we move ahead! Call me in advance if you can and Ill give a short update! Thx, Steve Phone #: ###-#### Inspection requested via web by Steven Meredith Discussed disc needed on house if power doesnt enter new panel upon entry. Kitchen recept on wall will serv as adequate as I would consider a peninsular.
|