Final | 1/20/2020 | 1/21/2020 | 1/21/2020 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting final ok
|
Electrical Rough-In | 1/8/2020 | 1/9/2020 | 1/9/2020 | P | PASS |
James Ady
|
|
|
Jay Phone #: ###-#### Panel listing ok. Project ready for final pending plan mod. (Moved array to different roof location)
|
Electrical Rough-In | 12/27/2019 | 12/30/2019 | 12/30/2019 | A | NR |
James Ady
|
|
|
Please call Brian Prussia with any questions or concerns at 208.241.5835 Phone #: ###-#### Inspection requested via web by BRS Permitting Racking and inverters have been checked. Paper work onsite. Panels not onsite. Asked that atleast 1 panel be left off roof to verify listing. (Jinko panel) Recall when panels are onsite
|