Final | 6/11/2020 | 6/12/2020 | 6/12/2020 | A | PASS |
James Ady
|
|
|
Please, Call Troy 30 minutes before so he can meet you at the job Phone #: ###-#### Inspection requested via web by Don Conley Kitchen final ok
|
Electrical Rough-In | 11/26/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Kitchen only. Island will need 2 receps at final rough in ok
|
Conference | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Talked about counter above washer and dryer. It will not be usable. Uper cabinets sit directly on top. Will not require receps.
|