Final | 1/30/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Mark Moncarr
|
|
|
master bath. Go thru side gate. Phone #: ###-#### Inspection requested via web by David McClellan Ok final
|
Electrical Rough-In | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Eric Story
|
|
|
heated floor in master bath Phone #: ###-#### Inspection requested via web by David McClellan Master bath flor heat ok to cover
|
Electrical Rough-In | 11/21/2019 | 11/22/2019 | 11/22/2019 | A | PASS |
Mark Moncarr
|
|
|
master bath. park on Eastman and come in thru side gate. knock o kitchen side door. Call Tim(GC) in advance. ###-#### Phone #: ###-#### Inspection requested via web by David McClellan Ok cover mstr bath
|
Electrical Rough-In | 11/21/2019 | 11/25/2019 | 11/21/2019 | P | CANC |
Mark Moncarr
|
|
|
Homeowner is Amy. Master bath remodel. come through side gate on Eastman to kitchen door. Phone #: ###-#### >> Inspection requested via web by David McClellan Inspection cancelled from web by: David McClellan
|