Final | 3/18/2020 | 3/19/2020 | 3/19/2020 | A | PASS |
Mark Moncarr
|
|
|
Working in detached garage, best access in alley Phone #: ###-#### Inspection requested via web by Kellan Curtis Ok final bath above garage
|
Electrical Rough-In | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kellan Curtis Ok cover up bath in garage and back wall recepts off bath
|
Conference | 12/26/2019 | 12/27/2019 | 12/27/2019 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kellan Curtis Discussed wiing of detached garage bonus room 1/2 bath- owner and father have great handle on job and can complete project. All code discussed of branch circuits required and GFCI protection for all ares needed and hot water install with proper sized conductors as per Man specs....
|