Final | 5/14/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Tom Saunders
|
|
|
Please call Brad (###-####) 30 minutes ahead for access Phone #: ###-#### Inspection requested via web by Brad Girard...
HVAC units labelled and OCPD verified Panel labelling complete Equipment listings and OCPD ok wired by rated S/O cord with required strain reliefs and outlet boxes and receptacles ok to final
|
Final | 5/14/2020 | 5/14/2020 | 5/14/2020 | A | CANC |
Tom Saunders
|
|
|
Please call Brad (###-####) 30 minutes ahead for access Phone #: ###-#### Inspection requested via web by Brad Girard...scheduled twice by accident
|
Final | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | PART |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Girard... temp occupency given...remaining labelling of panels and HVAC units, misc thru out building, service ground protection, and all equipment for UL verification,circuitry, breaker size
|
Permanent Service | 4/19/2020 | 4/20/2020 | 4/20/2020 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Girard.... uffer will be protected and attachment protected perm AFC label required by final...verified from ID Power email and fused disconnects ok p/s u/g new ok
|
Permanent Service | 4/17/2020 | 4/20/2020 | 4/19/2020 | A | CANC |
Tom Saunders
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Girard Inspection cancelled from web by: Brad Girard
|
Electrical Rough-In | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
Tom Saunders
|
|
|
Need grid inspection for office areas Phone #: ###-#### Inspection requested via web by Brad Girard...offices and dezine rm...grid ok
|
Electrical Rough-In | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Girard...walls and bath hardlids ok to cover
|
Electrical Rough-In | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Tom Saunders
|
|
|
I need (2) pole bases inspected, (1) is by the job trailer and (1) is on the north by the freeway Phone #: ###-#### Inspection requested via web by Brad Girard...ok to pour x 2
|
Electrical Rough-In | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | CANC |
Tom Saunders
|
|
|
Need underground inspection for conduits that go to (2) pole bases Phone #: ###-#### Inspection requested via web by Brad Girard... 3/4" to pole lights 1" for signage ok to cover
|
Electrical Rough-In | 11/26/2019 | 11/26/2019 | 11/26/2019 | A | PASS |
Tom Saunders
|
|
|
Need under ground inspection Phone #: ###-#### Inspection requested via web by Brad Girard... underground feeders and branch circuits for interior and exterior uffer ground verified
|