Final | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Burke Corridor clean up good. Thank you. Final ok
|
Electrical Rough-In | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Rock A. Hudson
|
|
|
Office ceilings. Phone #: ###-#### Inspection requested via web by Kevin Burke Spoke with building maintenance who have a electrical contractors license will close up exposed wiring in this corridor area. Some boxes are associated with TI on this permit and will need confirmed they ar closed up. I will check misc areas in corridor for safety issue at that time. Office hardlids only rough in ok cover
|
Electrical Rough-In | 12/3/2019 | 12/3/2019 | 12/3/2019 | A | PASS |
Rock A. Hudson
|
|
|
Walls. Please call ahead cause you’ll need key. Phone #: ###-#### Inspection requested via web by Kevin Burke Attention is required for corridor between this space and elevator lobby. Several open boxes, some have to do with this space and some do not. Unsupported cables, conduits, boxes, exposed wiring hanging out of unused connectors. Area has grid cover in place. Steps must be taken to address safety issues or an MIS permit will be started to ensure repair. Walls only rough in ok cover
|