Final | 1/12/2020 | 1/13/2020 | 1/13/2020 | P | PASS |
Tom Saunders
|
|
|
Just in case! Please call me about 30 min before to get there with key for access, Phone #: ###-#### Inspection requested via web by Steven Meredith... new equipment hard wired with breaker lockouts and new recepticles GFCIs...ok to final
|
Electrical Rough-In | 1/12/2020 | 1/13/2020 | 1/13/2020 | A | CANC |
Tom Saunders
|
|
|
Please call me about 30 min before to get there with key for access, Ill try to be there by 10:00... thx, Steve Phone #: ###-#### Inspection requested via web by Steven Meredith...scheduled for PM
|
Final | 1/5/2020 | 1/7/2020 | 1/7/2020 | P | PART |
Tom Saunders
|
|
|
Final for the hood portion and sign off requested, looks like maybe a little additional per owner request, we can discuss! I may be there but please call prior for access just in case, I have the key! Thx. Steve BPL Phone #: ###-#### Inspection requested via web by Steven Meredith... partial final for hood wiring added work will be added to this permit and updated fees will be applied as needed
|
Electrical Rough-In | 12/30/2019 | 12/31/2019 | 12/31/2019 | P | PASS |
James Ady
|
|
|
Please call me for access 30 min prior, I have the key! thx Steve Phone #: ###-#### Inspection requested via web by Steven Meredith ANSUL system rough in only. All surface mount conduit. 20/20 quad breaker needs replaced with 15/15 quad as per nameplate on ANSUL panel. Need to check RTU on final after VFD's have been enrgized.
|
Conference | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | DONE |
Daryl DeGrange
|
|
|
Hi Tom, Mid to late morning is most likely Best! please call me for access also because we may have the door locked other wise we get random walk in''s,Lol. Thx, Steve BPL Phone #: ###-#### Inspection requested via web by Steven Meredith Discussed stunt-trip equipment, circuitry
|