Permanent Service | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | PASS |
Mark Moncarr
|
|
|
###-#### IDP may require a guy kit. p/s o/h n ok
|
Rough-In Permanent Service | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | CANC |
Mark Moncarr
|
|
|
Resceduled for 3/16
|
Electrical Rough-In | 3/12/2020 | 3/13/2020 | 3/13/2020 | P | PASS |
Mark Moncarr
|
|
|
Bryan Phone #: ###-#### Ok cover shed
|
Conference | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | DONE |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Brandon Greeson-Barreith Discussed location of meter. Meter on N side of shed will have about 32"-34". I was fine with the working clearence.
|