Final | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Mark Moncarr
|
|
|
Jay Phone #: ###-#### Ok final. 200a meter main that was used as sub panel, was changed out to an outdoor 100a panel. Panel labeled.
|
Final | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | FAIL |
Mark Moncarr
|
|
|
Jay Phone #: ###-#### Unable to use meter main as sub panel. No way to seperate neutral feeding panel, and grounds on panel side. Also load calc will be needed to make sure house sub panel and modular panel dont pull more than 80% of buss rating.
|