Electrical Rough-In | 6/9/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Tom Saunders
|
|
|
Lee Phone #: ###-####...underground pipe from service location to junction box and junction box to shop ...depth verified and ok to cover
|
Rough-In Permanent Service | 5/5/2020 | 5/6/2020 | 5/6/2020 | A | PASS |
Tom Saunders
|
|
|
screened // Leland Phone #: ###-####... no new service...will hire contractor #6 ground needs installed from main service to sub panel at shop...pipe feeding shop needs approved from main service at house to junction box at pole in yard...from pole to shop verified at shop approved grounding at shop, sub panel seperation of grounds and neutrals, and wiring of overhead outlets for lighting.
|
Conference | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Tom Saunders
|
|
|
call ahead leland Phone #: ###-####... discussed requirements to get power to shop...what needs to be done to shop that is wired before inspection-m/c, metal boxes-mud rings and ground screws needed service changed required to feed shop with power..discussed new grounding and all-in-one...ground wire needs installed from main service to shop and ground to installed uffer verify depth of pipe for feeders-installed before inspection-by open ends at shop and junction boxes at pole
|