Final | 2/20/2020 | 2/21/2020 | 2/21/2020 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Ragan Approved set of prints on site. Final ok
|
Final | 2/20/2020 | 2/21/2020 | 2/20/2020 | A | CANC |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Steven Ragan Inspection cancelled from web by: Steven Ragan
|
Electrical Rough-In | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
Mark Moncarr
|
|
|
ceiling inspection for cover Phone #: ###-#### Inspection requested via web by Steven Ragan Ok cover. Verified with Mike that lighting was taken down. Correction made.
|
Electrical Rough-In | 2/12/2020 | 2/13/2020 | 2/13/2020 | A | FAIL |
Rock A. Hudson
|
|
|
Ceiling Phone #: ###-#### Inspection requested via web by Steven Ragan 400.12- Flexible cord shall not be installed above grid, or pass thru walls.Temp lighting cord assembly shall be removed.
|
Electrical Rough-In | 12/24/2019 | 12/26/2019 | 12/26/2019 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Steven Ragan Conference room 246 square feet. Walls only rough in ok cover
|