Final | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Eric Story
|
|
|
We will schedule a time to meet onsite to walk through the system. Phone #: ###-#### Inspection requested via web by Jesse Simpson Final ok
|
Electrical Rough-In | 12/27/2019 | 12/30/2019 | 12/30/2019 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Jesse Simpson Job was inspected on 12/27 by Rock and passed.
|
Electrical Rough-In | 12/27/2019 | 12/27/2019 | 12/27/2019 | P | PASS |
Rock A. Hudson
|
|
|
Shawn contact ###-#### Contractor missed cut off for requesting inspections. They called and we were in the area so drove by and inspected listings. Listings confirmed. Rough in ok
|