Final | 4/9/2020 | 4/10/2020 | 4/10/2020 | A | PASS |
James Ady
|
|
|
Garage code is 2275 enter Phone #: ###-#### Inspection requested via web by Zane Robertson final ok
|
Electrical Rough-In | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | PASS |
James Ady
|
|
|
Master bath floor heat Phone #: ###-#### Inspection requested via web by Zane Robertson COrrections made Master floor heat rough in ok
|
Electrical Rough-In | 3/17/2020 | 3/18/2020 | 3/18/2020 | A | FAIL |
Rock A. Hudson
|
|
|
Floor heat master bath Phone #: ###-#### Inspection requested via web by Zane Robertson 110.3- Cold lead splice shall be located in the floor as per manufacturers instructions.
|
Rough-In Permanent Service | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Zane Robertson rough in ok p/s u/g n ok
|
Electrical Rough-In | 12/30/2019 | 12/31/2019 | 12/31/2019 | P | PASS |
James Ady
|
|
|
Underground for floor plugs and island Phone #: ###-#### Inspection requested via web by Zane Robertson underground ok to cover
|